From creating custom patterns, to molding, machining then finally lining and coating, we do it all in house. Utilizing our in-house pattern shop, we can create custom patterns for any job. Metalfit operates four induction furnaces and four casting & molding lines, a full machine shop, and a linings and coatings department all on site. For a full explanation of our processes, please view our U.S. Pipe overview video.
This line is a Semi-automatic molding line, using:
For the waterworks industry, the green sand line is used to produce smaller fittings & castings, including
Currently, this is the most popular range of sizes, which subsequently directly relates to typically longer lead times than other sizes.
Typical Production Time: 4-6 weeks
Contact us for current stock availability.
Subscribe to our weekly delivery times newsletter for this week’s lead times!
This line is a Semi-automatic, flask less molding line, with molds that can vary in size up to 60”x 60”x 29”/29”, to produce castings up to 1400 lbs.
For the waterworks industry, the No-Bake line is used to produce mid-sized fittings & castings, including
This is the mid-size range size fittings, with lower demand, therefore typically faster lead times.
Typical Production Time: 4-6 weeks
Contact us for current stock availability.
Subscribe to our weekly delivery times newsletter for this week’s lead times!
This line is a manual molding line in the floor, using the no bake system and flasks up to 110”x 110”x 36”/36”, to produce castings up to 5000 lbs.
For the waterworks industry, the floor mold line is used to produce the largest fittings & castings, including
30” to 48” Flanged & MJ Fittings
These are the largest size fittings, with lower demand, therefore typically faster lead times.
Typical Production Time: 4-6 weeks
Contact us for current stock availability.
Subscribe to our weekly delivery times newsletter for this week’s lead times!